LG-1 Hydroelectric Generating Station
Energy
James Bay, QC, CA
With great precision and attention to detail, we expanded and redeveloped the 1,858-m² control house at the Bersimis 1 Hydroelectric Generating Station, building a concrete structure between the existing building and the nearby cliff.
The work was done in stages to facilitate the relocation of personnel and, most importantly, prevent any disruption to the building's primary function: power distribution.
We blasted rock, keeping vibrations to a minimum to prevent damage to the station’s existing infrastructure and electrical equipment.
1,858 m2