SM-3 Head Race Tunnel Work

For our client, Hydro-Quebec, we had the mandate to perform the following work:

  • Designing and building a one-kilometre access road to the channel head and water intake canal
  • Excavating and concreting the channel head, water intake and 1,000 m SM-3 head race tunnel (equipped with a 329-m surge chamber with an open-cut basin near the generating station)
  • Designing, supplying, installing and commissioning weather protection, emergency lighting, water supply and drying systems.

We completed the project efficiently: we excavated 68,000 m³ of rock for the channel head and 190,000 m³ of underground rock for the head race tunnel. We also used 22,450 m² of anchored wire mesh with 9,295 m of bolts to prevent rock chipping and shore up the excavated rock walls.

For the channel head, we used sluice gate guides and debris grills. The project required 9,000 m³ of concrete and 375,000 kg of structural steel.

head race tunnel excavation head race tunnel concreting

The Site in Figures

190,000 m3

of excavated underground rock for the head race tunnel

375,000 kg

kg structural steel in use