LG-1 Hydroelectric Generating Station
Energy
James Bay, QC, CA
For our client, Hydro-Quebec, we had the mandate to perform the following work:
We completed the project efficiently: we excavated 68,000 m³ of rock for the channel head and 190,000 m³ of underground rock for the head race tunnel. We also used 22,450 m² of anchored wire mesh with 9,295 m of bolts to prevent rock chipping and shore up the excavated rock walls.
For the channel head, we used sluice gate guides and debris grills. The project required 9,000 m³ of concrete and 375,000 kg of structural steel.
190,000 m3
375,000 kg