Baie-Saint-Paul Hospital

Client
Société québécoise des infrastructures (SQI)
Sector
Health and Research
Delivery mode
Construction Management & Lump Sum Contract
Location
Baie-Saint-Paul, QC, CA
Year built
2018
hospital building

Design, Construction and Financing

We were awarded the contract for the design, construction and interim financing of the new Baie-Saint-Paul Hospital complex, including a hospital building and a long-term care facility (CHSLD).


The four-storey, 34,676 m2 hospital includes these features:

  • Emergency department.
  • Operating rooms.
  • Outpatient clinics.
  • Short-term geriatric unit.
  • Intensive functional rehabilitation unit.
  • Beds.

The project was divided into four major milestones:

  1. Structural work.
  2. Delivery of the long-term care facility and the thermal power plant.
  3. Delivery of the hospital and three of the four parking lots.
  4. Demolition of the old hospital and the re-development of the site it occupied (plus the completion of the last parking lot).

Despite many challenges along the way, we completed the project six months ahead of the set deadline, meeting the requirements set by the client.

Finished Six Months ahead of schedule

We delivered the new hospital six months ahead of schedule, allowing the client to quickly move into the new facility.
hospital hallway

Our Challenges

Minimizing Disruptions

We built the hospital complex, despite ongoing school, business and arena activity nearby and the 24/7 availability of services at the hospital.


Installing Cutting-Edge Equipment

We installed many state-of-the-art medical devices with the utmost care.


Active Earthquake Zone

The building is located in one of the most active earthquake zones in Canada. For this reason, we planned the design and construction to address this challenge, including extensive soil consolidation and a mixed steel-concrete structure for the floors and earthquake-resistant joints.


Tight Project Impact Control

We tightly controlled dust, noise, vibration, odour and traffic levels during the project.


Strict Asbestos Abatement Requirements

During the demolition of the old hospital, we discovered asbestos and had to decontaminate the site.

The Site in Figures

34,676 m2

of total surface area

$159.5M

budget