Bombardier FAL Static Building

Client
Bombardier Inc.
Sector
Industrial
Delivery mode
Lump Sum
Location
Mirabel, QC, CA
Year built
2014
bombardier-fal-static-projets-batiment

Multi-Purpose Building Construction

Our team built a 43,655 m² multi-purpose building, including an office space and a 22,510 m² hangar for Bombardier. Despite a tight schedule and a high level of complexity, we completed the project within the allotted timeline.

The building, named Final Assembly Line (FAL) Static, was part of a new development on the site.


The project included these components:

  • Building a four-storey office space for administrative staff (including conference rooms, an amphitheatre, a training room and changing rooms).
  • Construction of a 22,510 m² hangar with four aircraft positions (including underground utilities for ventilation, electrical and drainage services).
  • Adding Tarmac-type access for aircraft entry.

We successfully completed the project thanks in part to our use of Building Information Modelling (BIM) technology. With this innovative approach, we could simplify the design process and better coordinate stakeholders throughout the project.

Our Challenges

A Highly Complex Project

We used Building Information Modelling (BIM) technology to create a comprehensive data environment to reduce potential conflicts.


A Tight Schedule

We fast-tracked this mandate to deliver the project within the allotted timeline.

The Site in Figures

43,655 m2

in total surface area

22,510 m2

in total surface area for the hangar only